1. Plowing operation: connect and install the plow, drive the machine to the work site, lower the plow blades to an appropriate depth, and start the plowing operation. Plowing operations should master the depth, and not too deep to damage the machinery.
2. Rotary tillage operation: connect and install the rotary plough, drive the machine to the work site, lower the rotary tiller blades and start operation. During rotary tillage operations, the hard objects such as rocks on the ground should be removed first to prevent damage to the machinery.
3. Grader operation: Replace the grader, drive the machine to the work site, manipulate the hight of the grader, scrape and flatten the ground bulk materials. When flatten the ground, it is forbidden to stand on the grader. When pressurization is needed, mud and stones can be tied in bags.
4. When working backwards, look back at the forward direction and obstacles on the ground,so that to prevent any accidents.
5. During the operation of the machine, anyone are forbidden to go up and down, and meantime repair and maintenance operations are prohibited.